SECOND VISIT
15/6/2019
Due to the library condition on the first visit, I decide to come the second time to only focussing on the flooring on 15 June.
​
​
first, we meet at Taylors around 8:50am and depart at 9am, we arrive there around 10am and start to move all the stuff we left in the library on the first visit
.
​
Once we move everything out, we start cleaning the floor using the DETTOL soup to kill the bacterial on floor. After cleaning it we swipe all the water out to make it dry faster.
​
​
​
​
​
​
​
​
​
​
Once the floor is dry, we sweep the floor using broom to make sure there is no sand, stone or dust on the floor.
​
​
​
​
​
​
​
​
​
It was around 11:30am, the floor dried and we start to cover all the hole and uneven surface on the floor using white clay. After repairing the floor, we let it dry and eat our lunch around 12:30.
​
​
​
​
​
​
​
​
​
​
​
​
After the floor complete dry, we start the epoxy painting process at 1pm.
The flooring materials we are using are Epoxy middle grey.
The original planning was to paint three layer for the floor.
But the weather on that day are mostly cloudy and rainy day, the paint dry up too slow.
​
​
​
​
​
​
​
​
​
​
​
​
​
​
​
​
​
We apply the First layer of epoxy around 1:40pm and it dry up to 80% on 5:30pm. therefore we got no choice to give up applying the second and third layer epoxy.
​
In order to make sure the epoxy last longer, we touch up the side, uneven surface and the hole on the floor to make sure there is no miss paint area.
​
​
​
​
​
​
​
​
​
​
​
We did our best and complete the work on that day. We are happy to see the outcome.
CLEAN
​
SMOOTH
​
HIGH GLOSS
BRIGHTER
​
SAFE
​
EASY TO CLEAN
​
WATER PROOF
I APPRECIATE MY TEAM MEMBERS, WE HELP EACH OTHER AND TAKE TURN TO FINISH THE WORK. WE DID IT AS TAYLOS'S STUDENT.
WE DID OUR BEST.
​
I AM VILLSON (HO JIE SHIEN) WITH RED ARROW ON THE PHOTO.